Projects
/
Glow Energy Phase 2/3 Cogeneration Plant
Glow Energy Phase 2/3 Cogeneration Plant
A full Denso corrosion protection system was applied to piping and piling infrastructure to ensure long-term durability under thermal and environmental stress.

At the Glow Energy Phase 3 Cogeneration Plant, Denso’s advanced protective solutions were used to safeguard piping, buried structures, and marine pilings. Products included Densyl Mastic (6 x 3 kg), Denso S105 Paste (2.5 kg/tub), Denso Marine Piling Tape (300 mm x 10 m), and Densoclad 41 HT (150 mm x 30 m).

This combination provided a robust, high-temperature-resistant corrosion barrier, ideal for areas with elevated heat, moisture, and soil exposure. The system supports reliable plant operations while minimizing long-term maintenance in critical infrastructure zones.

Discover Similar Projects
Let's Get in Touch
1
Inquiry
2
Contact Information
Thank You!
Thank you for submitting the form. Our sales will contact you as soon as possible!
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.